跳到内容
Ravington
返回信息流
经济

Greece's E65 Highway Completed: Athens-Grevena distance down to 4 hours

Periodista
WhatsApp
Greece's E65 Highway Completed: Athens-Grevena distance down to 4 hours
图片: periodista.gr

要点

  • The last 46 kilometers of the Central Greece Highway (E65) were opened, completing the 182.1-kilometer route.
  • Travel time from Athens to Grevena dropped to approximately 4 hours, and transportation towards the Western Balkans was shortened by 2 hours.
  • The road strategically connects the Egnatia Highway to the Athens-Selanik line and the ports of Volos and Igoumenitsa.
  • Within the scope of the project, 5 double-tube tunnels, 31 bridges, and 14 interchanges were constructed.

数据一览

182.1 kilometers total road46 kilometers final section4 hours Athens-Grevena time2 hours of time saving

The 46-kilometer final section of the Central Greece Highway (E65), one of Greece's most important infrastructure projects, has been opened to traffic. Thus, the strategic road, which has a total length of 182.1 kilometers and connects the Athens-Selanik Highway (A1) to the Egnatia Highway, has been fully put into service. The official opening ceremony will be held on Thursday, 23 July, with the participation of Prime Minister Kiriakos Miçotakis and Ministry of Infrastructure officials.

The completion of the project is expected to significantly reduce travel times in the region, boosting tourism and trade. While the travel time from Athens to Grevena has dropped to approximately 4 hours, the total journey from the Port of Pire to the Western Balkans has been shortened by about 2 hours. Access to tourist areas such as Meteora, Plastira Gölü, and Karpenisi has now become much faster and safer.

The E65 highway, constructed by TÜRN A, is considered a critical part of the international Transit (TEN-T) network. Equipped with dual lanes and modern security systems, this road aims to contribute to Greece's overall economic growth by enhancing the commercial, tourist, and agricultural potential in the country's inland regions.

对这条新闻做出反应

下一条新闻Finland increased its imports from Russia despite EU sanctions

询问这条新闻

回答由AI仅根据本新闻生成。

常见问题

Which route does the newly opened final section of the E65 Highway cover?
The northern section, which is 46 kilometers long and extends from Kalabaka to Grevena, was opened to traffic, ensuring the project's completion.
How did the new highway affect travel times?
While the travel time between Athens and Grevena decreased to approximately 4 hours, the travel time from the Port of Pire to the Western Balkans was shortened by about 2 hours.
What technical structures were built in the E65 project?
A total of 5 tunnels, 31 bridges, 14 interchanges, and numerous underpasses-overpasses were built along the 182.1-kilometer road route.

这是人工智能生成的简短摘要。全文请见原始来源。

阅读来源全文periodista.gr我们如何创作内容

相关新闻