Lewati ke konten
Ravington
Kembali ke berita
Dunia

Repair works continue in El Junquito following the June earthquakes in Venezuela

Primicia
WhatsApp
Repair works continue in El Junquito following the June earthquakes in Venezuela
Foto: primicia.com.ve

Poin Utama

  • Executive Vice President Delcy Rodríguez supervised the repair works in the El Junquito region, which was affected by the earthquakes in June.
  • Heavy machinery and a drone-supported technological monitoring system are being used in the region for debris removal and structural repairs.
  • Significant progress has been made in the gradual restoration of public services such as electricity and clean water.

Executive Vice President of Venezuela Delcy Rodríguez inspected the structural repair and social assistance works in the El Junquito region following the earthquakes that occurred in June. During the visit, accompanied by Head of the Government of Caracas Nahum Fernández, Mayor Carmen Meléndez, and President of Gran Misión Venezuela Renace Jacqueline Faría, the civil works carried out in the region were closely supervised.

In the earthquake-affected region, expert teams are rapidly continuing debris removal and structural repair activities using heavy machinery. Additionally, authorities have deployed a monitoring system utilizing drone technology to map the topography of the lands and instantly assess the technical condition of the buildings.

It was reported that significant progress has been made in the region's public services as part of the works, and the electricity and clean water pipelines are being gradually repaired. Rodríguez conducted field assessments together with engineer Francisco Garcés, who manages the process of technically reinforcing the structures.

Beri reaksi

Tanya tentang berita ini

Jawaban AI hanya dari berita ini.

Pertanyaan Umum

What is the reason for the structural repair works in El Junquito?
Buildings and infrastructure were damaged due to the earthquakes that struck the region this past June.
What technology are officials using for damage assessment?
Teams are using a monitoring system based on drone technology to map the topography of the lands and instantly assess the technical condition of the buildings.
What is the current status of basic public services in the region?
Significant progress has been made in the repair of electricity and clean water pipelines, and services are gradually being restored.

Ini ringkasan singkat buatan AI. Artikel lengkap ada di sumbernya.

Baca selengkapnya di sumberprimicia.com.veBagaimana kami membuat konten

Berita ini di sumber lain · 8 · 5 negara

VE3Argentina2TurkeyPeruBrazil

Berita terkait